Winter Storm Uri (2021)
A winter storm brought snow and ice to Central Texas. The TxDOT Austin district owned no snowplows at the time, so crews cleared state highways with motor graders, machines designed for summer earthwork.
The district responded with equipment meant for dirt work, an approach its engineer later described as ill-suited to the job.
The district gradually built a fleet, reaching 25 vehicles by November 2026, mostly through transfers from other districts.
The expanded fleet is a direct response to the gap Uri exposed, and the 2026 showcase was built around that comparison.
