Cutler told the BBC in 2020 that the dry, oxygen-free environment inside the capsule was the most likely reason fewer servers failed underwater than on land.

Stories

Underwater data centers move from prototype to commercial buildout

Built World

Frequently cited authority on subsea data center engineering

A sealed steel capsule now sits on the seabed off Shanghai's Nanhuizui coast, drawing more than 95% of its power from offshore wind turbines and pulling cold seawater across its servers. It is the world's first wind-powered underwater data center, and its operators have signed deals to scale the design into a 500-megawatt cluster.

Updated 2 hours ago