I-75 Modernization Project through Detroit (2017–2021)
MDOT rebuilt a long stretch of I-75 through Detroit, keeping traffic moving on the same corridor with temporary lanes and rolling ramp closures over several years. The project used phased detours resembling what Restore 94 does now.
Drivers faced years of narrowed lanes, reduced speeds, and repeated ramp shutdowns through the city.
The finished freeway reopened with rebuilt bridges and pavement, and the project set MDOT's template for managing major Detroit freeway reconstruction while traffic keeps flowing.
Restore 94 follows the same playbook on I-94, so the Livernois closure fits a pattern Detroit drivers have already navigated: long projects, rolling disruptions, and a clear end date.
