Statutory technical body
Appears in 1 story
Draft NEP 2026 issued for public consultation; mandates coal minimum technical load reduction to 40% by 2030 and targets 411 GWh of grid-connected storage by 2031-32
India added 30.6 gigawatts of renewable capacity in the first half of 2026, bringing total installed renewables to 288 gigawatts, but curtailment is worsening in step. Coal plants hit the 55% minimum thermal floor in over half of midday dispatch intervals by April 2026. One-third of the 54.8 gigawatts of recently commissioned capacity flows only through temporary grid routes, with curtailment running 50-60% during peak solar hours in Rajasthan and Gujarat.
Updated Jul 28
No stories match your search
Try a different keyword
How would you like to describe your experience with the app today?