Rock Creek Park Sewer Project (2011)
DC Water needed to remove trees in Washington, D.C.'s Rock Creek Park to repair a failing sewer line. The plan faced public opposition from residents and environmental groups.
The utility revised its plans to minimize tree loss and added replanting commitments.
The case set a precedent for incorporating public input on tree removal into infrastructure projects.
Shows how public hearings can influence infrastructure projects to reduce tree removal, similar to the Madison greenway hearing.
