Hurricane Maria (2017)
The storm tore through Puerto Rico's transmission and distribution system, leaving the island without power and exposing how fragile the state utility's infrastructure had become. Restoration stretched for months and became a political fight over contracts and control.
The federal government and mainland contractors took over parts of the rebuild, and the island's grid became a symbol of deferred maintenance.
The damage set the conditions for privatizing grid operations, which LUMA took over in 2021.
The one-year transition now underway is, in effect, a second attempt to decide who rebuilds and runs the system Maria wrecked.
